Home

About Us

Services

Projects

Careers

Offices

BCA Home
Plaza Bridge at Marine Way
US 101 Blossom Hill Interchange Improvements
Mineta San Jose International Airport ARFF Fire Station 20
Beacon Apartments
Gerald Desmond Bridge Replacement
Bayfront Expressway Pedestrian and Bicycle Overcrossing
Caltrain Santa Clara Station Pedestrian Undercrossing
Warm Springs BART Pedestrian Access Bridge and Entry Plaza
South Bayfront Pedestrian Bicycle Bridge
Prev
Next
 
 

 

 
 
 

 

 

 

MO Office 200px

 

 

MO Leadership 200px

 

Synaptics Building Campus

Biggs Cardosa performed the structural design for various tenant improvements to the 3-building campus. Scope of work included the structural support of multiple 35-foot tall freestanding entry structures, walkway trellises, and a new curtain wall system. Additionally, a complete seismic study was conducted on all three buildings to present various retrofit schemes to the owner with the intent of improving the performance of the buildings. One of the buildings, formerly a high-bay warehouse constructed of tilt-up concrete, was converted into a 2-story office building by upgrading the footings and adding a new floor of steel framing. The warehouse building was also seismically retrofitted to meet the requirements of the current California Building Code. Photos Courtesy of CAS Architects.

 

LOCATION
San Jose, CA