BCA Begins Work on the High Speed Rail Line from San Francisco to San Jose
Harkins Slough Road/Walker Street Corridor Construction and Slough Restoration Receives the Monterey Bay Area APWA Project of the Year
Biggs Cardosa was the prime consultant and the lead structural engineer working for the City on the Struve Slough and Watsonville Slough Bridges portion of this project. As structural and prime design consultant, we were responsible for the bridge design and for coordinating all roadway geometrics, traffic control, utility coordination and relocation and environmental issues associated with the project.
BCA Was Ranked #1 From a Field of 15 firms by the County of Santa Clara Roads and Airports Department
Biggs Cardosa was recently ranked for a 2-year Structures Design On-Call Contract for the County of Santa Clara.
BCA Receives Award from ACEC for SR 152/156 Improvement Project
Biggs Cardosa was the Prime Consultant and Structural Engineer hired by the Valley Transportation Authority (VTA) to reconfigure the hazardous intersection of State Routes 152 and 156, enhancing safety and relieving traffic congestion at one of the areaâs most notoriously dangerous spots. With our innovative design and efficient project management, We were able to help the VTA to construct a project that came in under budget and ahead of schedule.