SVBX BART Extension to San Jose Line SegmentBiggs Cardosa is acting as the Structures Leader on the 10-mile long Line Segment contract for the BART Extension to San Jose (SVBX Project). The project consists of Preliminary Engineering for the aboveground portion of the project, including approximately 40 structures (BART bridges, UPRR bridges, Station Guideways, Roadway Bridges over BART, Retained Cut Sections and Retained Fill Sections. Rendering courtesy of VBN Architects.
|
LOCATION
|